Non-Turf Match Pitch Installation Guide
Here we take a look at the stages involved in installing a non-turf match pitch to our England & Wales Cricket Board (ECB) approved tp365 specification, which meets the ECB’s exacting criteria for match play to provide a match-ready surface, whatever the weather…
1. Marking out of works area and removal of turf – 1st stage

2. Marking out of works area and removal of turf – 2nd stage

3. Installation of secondary stone layer

4. Installation of primary stone layer

5. Installation of TP2 pace modifying shock pad

6. Installation of TP1 woven playing surface – 1st image

7. Line marking in preparation for use

8. Finished product